Observatory ConstructionOriginal Construction Shortcut to Dome ConstructionThe observatory was originally constructed as a split roof design. First, a concrete block was poured for the metal pier. Then, the pier was installed and conduit run for power and data cabling.
Closeup of pier. Power (110VAC) stubbed out, but data lines not in the ground yet.
|